New construction of a test centre of 1.960 m2. The test centre comprises 15 departments, each having a separate suspended heating network and bench heating.
 
We have realized: 

  • A Venlo greenhouse with a 9.60 m trellis (3 x 3,20 m), 4 m section size and 3,90 m gutter height;
  • The 15 departments are accessible via a corridor.
  • An above ground main transport circuit;
  • A separate suspended heating network and bench heating in each department;
  • The complete boiler house plant with a capacity of 585 kW. The boilers use light oil fuel.
 